Production bottleneck: how to find it and expand it without buying equipment
For plants where there are more orders than output. In 2–5 days on site I find what really limits production.
A bottleneck is the area that limits the output of the whole plant. In 2–5 days on site I measure work-centre utilisation, find the bottleneck and give a plan to expand it: first without investment (schedule, changeovers, scrapping defects before the bottleneck), then with investment (equipment, space). The result is a capacity calculation for your product range and a prioritised list of measures.
Who it is for
- More orders, but output does not grow
- Everyone is busy, yet shipments are late
- You plan to buy equipment and want to be sure it goes to the right area
- After the range grew, capacity is «suddenly» not enough
What I do, step by step
- 1Data and walk-through
Range, volumes, routings, accounting data; a walk through the site to see where WIP accumulates.
- 2Utilisation measurement
Utilisation of work centres by product family, changeovers, downtime, Yamazumi chart for manual operations.
- 3Bottleneck and capacity
Where the constraint is and how much the plant can produce with your range.
- 4Measures without investment
The five focusing steps of the Theory of Constraints: exploit the bottleneck, subordinate other areas to it, keep defects away from it, cut changeovers, change the schedule.
- 5Measures with investment
Only when the no-investment measures are exhausted: equipment, people, space — with a calculated effect.
What you get
- Capacity calculation for your range
- Where the bottleneck is and why
- Prioritised measures: without and with investment
- Indicators to check the result
What I don't do
- I do not sell equipment or take supplier commissions
- I do not promise output growth before measurements
Frequently asked questions
How much does finding the bottleneck cost?
On-site diagnostics — from 2 consultant days (60,000 RUB per day).
What if there are several bottlenecks?
At any moment the constraint is usually one; a «floating» bottleneck is a sign that too much work is released at once. This is visible in the measurements too.
Sources: E. Goldratt, J. Cox, «The Goal»
Tell me what is happening in your production
The first consultation is free: up to 60 minutes online. I reply within one working day; after the call I send written conclusions and suggest a next step — no obligations.
Consultations are held in Russian or English.