TAnatoly Titovmanufacturing operations consultantFree consultation
This is a translation of the Russian website, prepared with AI. The Russian version is authoritative.Language:Русский · English · Қазақша · Oʻzbekcha · Тоҷикӣ · Հայերեն · ქართული · Türkçe
Main solution

Manufacturing operational efficiency: lower costs, higher productivity

For running plants: I find where money and time are lost and turn it into higher output and lower unit cost — without unnecessary investment.

In short

Operational efficiency is how much a plant produces and at what cost with the same people, equipment and space. I measure losses and utilisation, find bottlenecks and cost drivers, estimate the effect in money and implement measures together with your team — from quick changeovers and work standards to bottleneck-based planning and pull. I measure the result against indicators recorded at the start.

Book a free consultation

Who it is for

  • Unit cost grows faster than prices
  • People and equipment were added, but output barely grew
  • Lots of downtime, rework and waiting
  • You need to prepare for growth without inflating headcount

What I do, step by step

  1. 1
    Diagnostics — 2–5 days

    Value stream map, work-centre utilisation, equipment effectiveness, accounting data. I record the baseline: output per person, unit cost, on-time delivery, work in progress, defects.

  2. 2
    Estimate in money

    A map of losses: where and how much is lost — downtime, changeovers, rework, waiting, excess inventory and movement.

  3. 3
    Quick measures — 4–8 weeks

    Quick changeover (SMED), work standards, order at the bottleneck, a daily meeting at the KPI board.

  4. 4
    System measures

    Bottleneck-based planning, pull, quality control and assurance, line balancing.

  5. 5
    Sustaining

    Before/after indicators measured the same way; standards and supervisor training so the result holds without me.

What you get

  • A map of losses valued in money
  • An improvement programme ranked by effect and difficulty
  • Before/after indicators measured the same way
  • Standards and procedures that stay with your team

What I don't do

  • I do not promise a savings percentage before diagnostics: measurements come first
  • Headcount reduction is not a goal: freed capacity usually goes to higher output; staffing decisions are the owner's

Frequently asked questions

How much can be saved?

The honest answer comes after diagnostics. First I measure the baseline and value the losses, then we set targets together.

How much does it cost?

Diagnostics — from 2 consultant days (60,000 RUB per day). The next stages are estimated after diagnostics.

Sources: M. Rother, J. Shook, «Learning to See»; E. Goldratt, J. Cox, «The Goal»

Tell me what is happening in your production

The first consultation is free: up to 60 minutes online. I reply within one working day; after the call I send written conclusions and suggest a next step — no obligations.

Consultations are held in Russian or English.

Book a free consultation