Manufacturing operational efficiency: lower costs, higher productivity
For running plants: I find where money and time are lost and turn it into higher output and lower unit cost — without unnecessary investment.
Operational efficiency is how much a plant produces and at what cost with the same people, equipment and space. I measure losses and utilisation, find bottlenecks and cost drivers, estimate the effect in money and implement measures together with your team — from quick changeovers and work standards to bottleneck-based planning and pull. I measure the result against indicators recorded at the start.
Who it is for
- Unit cost grows faster than prices
- People and equipment were added, but output barely grew
- Lots of downtime, rework and waiting
- You need to prepare for growth without inflating headcount
What I do, step by step
- 1Diagnostics — 2–5 days
Value stream map, work-centre utilisation, equipment effectiveness, accounting data. I record the baseline: output per person, unit cost, on-time delivery, work in progress, defects.
- 2Estimate in money
A map of losses: where and how much is lost — downtime, changeovers, rework, waiting, excess inventory and movement.
- 3Quick measures — 4–8 weeks
Quick changeover (SMED), work standards, order at the bottleneck, a daily meeting at the KPI board.
- 4System measures
Bottleneck-based planning, pull, quality control and assurance, line balancing.
- 5Sustaining
Before/after indicators measured the same way; standards and supervisor training so the result holds without me.
What you get
- A map of losses valued in money
- An improvement programme ranked by effect and difficulty
- Before/after indicators measured the same way
- Standards and procedures that stay with your team
What I don't do
- I do not promise a savings percentage before diagnostics: measurements come first
- Headcount reduction is not a goal: freed capacity usually goes to higher output; staffing decisions are the owner's
Frequently asked questions
How much can be saved?
The honest answer comes after diagnostics. First I measure the baseline and value the losses, then we set targets together.
How much does it cost?
Diagnostics — from 2 consultant days (60,000 RUB per day). The next stages are estimated after diagnostics.
Sources: M. Rother, J. Shook, «Learning to See»; E. Goldratt, J. Cox, «The Goal»
Tell me what is happening in your production
The first consultation is free: up to 60 minutes online. I reply within one working day; after the call I send written conclusions and suggest a next step — no obligations.
Consultations are held in Russian or English.
Book a free consultation