Planning system

«Поток»: a planning system for high-mix, low-volume production

For low-volume and one-off production where every order is different and time standards are missing or inaccurate. Joint development of Anatoly Titov and Denis Butko; the product is «Потокум» (ospotokum.ru).

In short

«Поток» shows where every order is, what to release today and what lead time to promise the customer. It is based on the Theory of Constraints: release at the pace of the bottleneck, time buffers and priority by due date. I implement «Поток» together with restructuring planning: diagnostics, configuration, a 4-week pilot, roll-out.

Book a free consultation

Who it is for

  • Custom furniture, steel structures, machinery and engineer-to-order equipment
  • Hundreds of items, small batches, non-standard products
  • Make-to-order (MTO) and engineer-to-order (ETO) production

What I do, step by step

  1. 1
    Planning diagnostics

    How orders are accepted, lead times promised and work released today.

  2. 2
    Configuration for your flow

    Bottleneck, buffers, routings, roles.

  3. 3
    4-week pilot

    On one area or group of orders, with on-time delivery measured.

  4. 4
    Roll-out

    To the whole plant, training supervisors and planners.

What you get

  • Visibility of every order: area and time to due date
  • Lead times based on the bottleneck queue, protected by a time buffer
  • Release at the pace of the bottleneck
  • Supervisors record progress from a phone

What I don't do

  • Not needed for a stable range made to stock — release rules in a spreadsheet are enough
  • Not needed for a single flow line with a constant product

Frequently asked questions

Does it need time standards for each operation?

No. Rough time estimates at the bottleneck are enough: it sets the release pace, and other operations are protected by a time buffer (simplified drum-buffer-rope).

Sources: E. Schragenheim, H. W. Dettmer, «Manufacturing at Warp Speed»

Tell me what is happening in your production

The first consultation is free: up to 60 minutes online. I reply within one working day; after the call I send written conclusions and suggest a next step — no obligations.

Consultations are held in Russian or English.

Book a free consultation