TAnatoly Titovmanufacturing operations consultantFree consultation
This is a translation of the Russian website, prepared with AI. The Russian version is authoritative.Language:Русский · English · Қазақша · Oʻzbekcha · Тоҷикӣ · Հայերեն · ქართული · Türkçe
Main solution

Workshop layout: floor-space calculation and equipment placement

I develop a layout concept: calculate floor space, place equipment and plan space for raw materials, work in progress and finished goods — by calculation, not by eye.

In short

A process layout determines how many people, how much money and time production spends every day. I calculate capacity and the number of machines, floor space for work zones and inventory, compare 2–3 options by area, travel distance and staff, and hand the layout concept and input data to the designer. I do not produce CAD working drawings. Duration: 2–6 weeks.

Book a free consultation

Who it is for

  • You are building or renting a workshop and do not want to get the floor space wrong
  • You are relocating or expanding
  • You have run out of space: storage in the aisles, WIP everywhere
  • People and trolleys walk in figures of eight, lots of unnecessary movement

What I do, step by step

  1. 1
    Capacity and equipment

    From the product range and volumes: how many machines are needed, including changeovers and reserve for growth.

  2. 2
    Floor space

    Work zones, aisles, space for raw materials, WIP and finished goods — based on calculated inventory levels.

  3. 3
    Flows of materials and people

    Relationship chart, spaghetti diagram, Systematic Layout Planning (SLP).

  4. 4
    Placement options

    2–3 options compared by area, travel distance, staff and room for growth.

  5. 5
    Industry and building requirements

    Hygiene zoning in food production, GMP for cosmetics (ISO 22716), cold chain in fish processing; fire categories, aisle widths, floor loads, clear height, gates and loading zones, utilities.

  6. 6
    Layout concept

    A scaled workshop scheme with equipment, inventory zones and flows; input data for the designer who prepares the working drawings.

What you get

  • Layout concept: scaled scheme with equipment and zones for raw materials, WIP and finished goods (PDF)
  • Floor-space and inventory calculation (Excel)
  • Equipment list with quantities
  • Input data for the designer

What I don't do

  • A concept, not CAD working drawings: construction and working documentation is prepared by your licensed designer from my concept
  • I do not supply equipment and take no commission from suppliers

Frequently asked questions

Can a layout be made for a rented building?

Yes. I start with measurements and building constraints: columns, gates, floor loads, utilities.

How much does it cost?

A layout concept for a workshop up to 2,000 m² usually takes 5–10 consultant days; an exact estimate after the free consultation.

Sources: Richard Muther, «Systematic Layout Planning» (1961). Anatoly Titov is a civil engineer by education.

Tell me what is happening in your production

The first consultation is free: up to 60 minutes online. I reply within one working day; after the call I send written conclusions and suggest a next step — no obligations.

Consultations are held in Russian or English.

Book a free consultation